We break the work into items, give each item an hours range, convert the hours into Flex Credits at a set rate, add overheads for QA, strategy and AI usage, and show you the total as a range from low to high.
Break the work into items
We list each distinct deliverable as its own item, for example “new About page” or “update opening hours”. QA, project management, strategy and deployment are never listed as separate items, because they are added in step 4.
Give each item its hours
Most items match one of our standard presets. Each preset has an hours range, for an engineer working with AI.
| Preset | Hours, low to high |
|---|---|
| Small update | 0.1 to 0.25 |
| Blog post | 0.5 |
| New section | 0.5 to 1 |
| New page | 2 to 4 |
| Landing page | 6 to 10 |
| Website, 5 to 10 pages | 80 to 120 |
We place each item within its range, from the simplest case to the hardest. Our central estimate uses the middle of the range unless the item is clearly simpler or harder.
Convert hours to credits
Hours become build credits at a fixed rate of 30,000 Flex Credits per hour.
// build credits for one item
build = hours * 30000
// a new page at the middle of its range
build = 3 * 30000 // 90,000 credits
Add overheads for the type of job
Every job also needs QA and deployment, strategy and planning, and supporting AI token usage. These are added as a share of the build credits, depending on the type of job.
| Job type | What it means | QA and deployment | Strategy and planning | Supporting token usage |
|---|---|---|---|---|
| Routine | Changes to an existing site | 24% | 17% | 13% |
| Setup | A new build, rebuild or new system | 20% | 37% | 28% |
| Package | A fixed one-off bundle of work | 12% | 10% | 9% |
The same inputs always give the same answer.
The total and the range
The total is the build credits plus the three overheads. We also work the same items out at the bottom and top of every range, which gives you a low to high range around the central figure.
A worked example
A client asks for a new page and two small updates (new opening hours and a new phone number) on their existing site. This is a routine job.
| Item | Preset | Hours (middle) | Build credits |
|---|---|---|---|
| New page | New page | 3 | 90,000 |
| Update opening hours | Small update | 0.175 | 5,250 |
| Update phone number | Small update | 0.175 | 5,250 |
| Build total | 3.35 | 100,500 |